Workmen at faulty Fishbourne railway crossings

Road surfacing to take place on the A631 at Kelstern.
Road surfacing to take place on the A631 at Kelstern.
0
Have your say

BARRIERS at two railway crossings in Fishbourne have been down since about 8am this morning (December 1) due to an equipment fault.

Workmen are now in the process of replacing broken equipment at the crossings in Salthill Road and Black Boy Lane.

The equipment fault was caused by a temporary loss of external power supply from the national grid.

A spokesman for Network Rail has apologised for the traffic caused.